How do you respond when a buyer says your price is too high?
When a prospect says your price is too high, don't discount — ask what they're comparing it to, then re-anchor the conversation on the cost of staying with the status quo. In most cases "too expensive" isn't about the number on the page; it's a signal that the buyer hasn't connected your price to a problem they already know is costing them. Your job is to find that connection before you touch the figure.
That's the short answer. Here's how to work it in practice, especially if you're sending proposals for office or security software where budget owners compare line items against a spreadsheet instead of an outcome.
What "too expensive" actually means
Say you've sent a quote for a lobby kiosk rollout across four sites, and the facilities director comes back with "this is more than we budgeted for." That sentence hides at least three different objections, and each needs a different response:
- They don't see the value yet - the price feels disconnected from a result.
- They're comparing you to a cheaper, narrower tool, like a free sign-in sheet app.
- The number itself is fine, but the scope or payment terms don't fit their fiscal year.
Discounting answers none of these. It just trains the buyer to treat your first price as a starting offer, which makes every future renewal a negotiation.
Re-anchor on the cost of the problem
Before you talk about your price, get specific about the cost of what the buyer is doing today. Say a multi-site healthcare client is still using paper sign-in logs. Ask what happens when a regulator asks for a same-day visitor list, or when a patient's family member needs to be checked against a watchlist at the front desk during a busy shift change. Those aren't abstract risks - they're operational gaps you can describe in plain terms: staff time spent reconciling logs by hand, exposure during an incident, the awkwardness of a flagged visitor that nobody catches because the front desk is working off a clipboard.
Once the buyer is talking about that cost in their own words, your price stops being compared to "nothing" and starts being compared to the actual alternative, which is rarely free.
Adjust scope, not price
If the number is genuinely outside their budget, don't shave the price - shave the scope. This keeps your pricing consistent across every proposal, which matters more than any single deal, because the next buyer will eventually talk to this one.
Some options that preserve price integrity:
- Start with the sites that have the clearest compliance or safety exposure, and add the rest in a second phase.
- Trim to the features that address the stated problem first, and introduce reporting or integrations later.
- Offer a shorter initial term instead of a lower rate, so the buyer can prove value internally before committing longer.
Each of these is a real trade, not a discount dressed up as one. The buyer gets a lower invoice; you get a smaller, cleaner deliverable - not a thinner margin on the same work.
Put the conversation in writing, not in your head
Objection-handling only works if it's consistent across your team, not dependent on whichever rep is sharpest on a call. That's the gap most sales teams run into: the good response lives in one person's head, and the next rep reinvents it badly, or reaches for a discount because they don't have anything better to say. A structured way to practice responses to the objections that come up most, including price, is exactly what Kahrbon's objection-handling coach is built for - it turns "re-anchor, then adjust scope" into something your whole team does by default, not something only your best closer remembers.
When you do move to a revised proposal, draft it through Pitch so the scope change, the price, and the reasoning behind it all live in one AI-drafted document instead of scattered across emails. That matters for audit-trail reasons too - if a procurement committee asks why the second proposal differs from the first, you want a clean document, not a memory.
A quick reference table
| Signal from the buyer | What it usually means | What to do | |---|---|---| | "This is more than we expected" | Price wasn't anchored to a known cost | Reconnect the price to a specific operational or compliance gap | | "A competitor is cheaper" | They're comparing scope, not value | Clarify what's included and what the cheaper option leaves out | | "We don't have budget this cycle" | Timing problem, not a price problem | Offer a phased start or shorter term, not a lower rate | | "Can you do better on this number?" | Testing whether your price is negotiable | Hold the number, offer to adjust scope instead |
Track what actually happens after the proposal goes out
If you're sending proposals regularly, you'll eventually want to know which objections show up most and which responses actually close. That's worth tracking at the team level - a shared log of "objection raised / response used / outcome," reviewed inside analytics, will tell you more about your pricing than any single negotiation will. Once a scope or term is agreed, keep the final version somewhere the whole team can find it - Folio works for that, so the next renewal conversation starts from the actual signed terms instead of someone's recollection of them.
Frequently Asked Questions
Should I ever discount to win a deal?
Discounting occasionally isn't automatically wrong, but it should be a deliberate, documented exception tied to something specific - a multi-year commitment, a reference site, a pilot - not a default response to "it's too expensive." If you discount without a reason attached, you've just taught the buyer what your real price is.
How do I know if the objection is about price or about value?
Ask directly: "Is the number the issue, or are you not sure this solves the problem yet?" Buyers will usually tell you the truth if you ask plainly instead of assuming. If they can't point to a specific concern about outcomes, the objection is probably about budget timing, not value.
What if the buyer compares us to a cheaper tool?
Get specific about what the cheaper tool doesn't do. Ask the buyer to walk you through how they'd handle a scenario it doesn't cover - a watchlist match, an emergency headcount, a badge audit. Let them articulate the gap rather than having you list features at them.
Is it okay to adjust price based on site count or user count?
Tiered pricing based on scope - sites, users, locations - is standard and fine as long as it's applied consistently. What you want to avoid is ad hoc discounting negotiated deal by deal with no consistent logic behind it; check your published pricing structure before you improvise one on a call.
Where do I send a revised proposal once we've agreed on scope?
Draft the updated terms in Pitch so the price, scope, and rationale live in one document, and keep a copy in Folio so your team has a record of what was actually agreed, not just what was first quoted.
Ready to put a consistent process behind every proposal your team sends? Get started with Kahrbon, or talk to us about setting up Pitch and the objection-handling coach for your sales team.
Kahrbon Team
Product
Expert insights on visitor management, physical security, and workplace safety from the Kahrbon team.